Starting at 10am – The work planned includes:
Further raking/spreading of the stone in the new dog entry site by the rope swing;
Rut-busting or raking the path beside Coxs Wood;
Coppicing hawthorn alongside the brook to reduce shading;
Clearance of overgrowth ready for digging the second backwater, below the wooden bridge;
Water sampling and invertebrate (kick) sampling.
Leave A Comment
You must be logged in to post a comment.