Helped needed starting at 10am. We have hired machinery and will have 18 tonnes of gravel delivered in advance, and on the day a 4 ton mini-digger and a 7m tele-hoist with a 2 ton bucket. Our aim will be to re-profile the ‘rope swing’ dog entry point (to a slope of 20-30 degrees), and to carry gravel from Oxford Road to that site and spread it on the silt bed and the dog entry slope.
Please bring wellies or waders so you can help in the brook too! As always there will be other jobs so please come if you can.
Leave A Comment
You must be logged in to post a comment.